Friday, June 30, 2006

Cleaning

Jules Craynock and Nancy Ash cleaned station June 29th. Jules reports some moderate bleaching of brain corals.

Jim

Wednesday, May 31, 2006

May maintenance

Monthly cleaning was done with the ground-truthing CT and was checked for any wear and tear, which was in really good conditions. The only exception was for the surface rust on the upper links of the chain where it meets the stainless steel shackles. In all upper links of the chain, zincs were installed. As well most of all the shackles were moused with wire, which replaced the older zip ties that were in.

Besides the maintenance, the deep water CTD sensor was exchange with a "new" CTD sensor with an improved capillary tube for the pressure sensor. The replacement was done between 0830-0930. The replaced CTD sensor was brought back to the lab.

Hector Casanova

Friday, April 28, 2006

Cleaned 8 legs/chains-spectra-lashings, only soft growth found.

Station in very good condition - lack of accumulated biofouling.

Ongoing cleaning efforts working well.

Many plastic ties brittle, breaking , and need replacement.

Groundtruthing schedule:

0845.............Connected groundtruth CT
0900 - 1000...Transmitting period
1015 - 1045...Cleaned sensors
1000 - 1200...Transmitting period
1215.............Disconnect CT
1300.............Normal transmit begins

Notes:

Need some sort of zinc(?) protection for all 8 upper links of galv. chain touching SS shackles- accelerated deterioration noted.

Two temporary white warning floats attached to legs 2 & 6. Original yellow floats probably stolen. Bahamian smallboats cutting close to pylon at high speed, even when work crew present with dive flag.

J.Craynock / H. Casanova

Wednesday, April 19, 2006

Basic Cleaning

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 04/16/06 Start time: 1530 End time: 1700

Type of cleaning:
X BASIC
COMPLETE
CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments:

COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
􀂉 Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
􀂉 Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
􀂉 Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Signed: Brenda Gadd
Date: 04/19/06

Tuesday, April 04, 2006

partial full service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 4/3/06 Start time: 09:50 End time: 13:40

Type of cleaning:
X BASIC
COMPLETE
X CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Chain marker buoys all missing. No line remnants on chains.

COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
X Inspect shackles
X Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: E. Mueller showed Brenda Gadd cleaning, CTD validation and blogging procedures.

Signed: Erich Mueller
Date: 4/3/06

Monday, March 06, 2006

partial full service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 3/5/06 Start time: 10:43 End time: 14:40

Type of cleaning:
X BASIC
COMPLETE
X CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Cleaned PAR sensors 3/4/06 at 14:00. All other tasks on 3/5/06.

COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
X Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: Found cable tie siezing on one shacle missing - replaced. Removed loose cable ties securing cables and added new ones. Mooring line was seen to be frayed and untwisted at base. Use with caution.

Signed: Erich Mueller
Date: 3/5/06

Thursday, February 09, 2006

basic service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 2/8/06 Start time: 10:45 End time: 11:15

Type of cleaning:
X BASIC
COMPLETE
CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Re-secured rubber pad over Kevlar cable sheath with
new cable tie. Sheath was abraded through in one spot.


COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
􀂉 Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
􀂉 Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
􀂉 Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Signed: Erich Mueller
Date: 2/9/06