Friday, April 28, 2006

Cleaned 8 legs/chains-spectra-lashings, only soft growth found.

Station in very good condition - lack of accumulated biofouling.

Ongoing cleaning efforts working well.

Many plastic ties brittle, breaking , and need replacement.

Groundtruthing schedule:

0845.............Connected groundtruth CT
0900 - 1000...Transmitting period
1015 - 1045...Cleaned sensors
1000 - 1200...Transmitting period
1215.............Disconnect CT
1300.............Normal transmit begins

Notes:

Need some sort of zinc(?) protection for all 8 upper links of galv. chain touching SS shackles- accelerated deterioration noted.

Two temporary white warning floats attached to legs 2 & 6. Original yellow floats probably stolen. Bahamian smallboats cutting close to pylon at high speed, even when work crew present with dive flag.

J.Craynock / H. Casanova

Wednesday, April 19, 2006

Basic Cleaning

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 04/16/06 Start time: 1530 End time: 1700

Type of cleaning:
X BASIC
COMPLETE
CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments:

COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
􀂉 Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
􀂉 Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
􀂉 Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Signed: Brenda Gadd
Date: 04/19/06

Tuesday, April 04, 2006

partial full service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 4/3/06 Start time: 09:50 End time: 13:40

Type of cleaning:
X BASIC
COMPLETE
X CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Chain marker buoys all missing. No line remnants on chains.

COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
X Inspect shackles
X Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: E. Mueller showed Brenda Gadd cleaning, CTD validation and blogging procedures.

Signed: Erich Mueller
Date: 4/3/06