Thursday, February 09, 2006

basic service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 2/8/06 Start time: 10:45 End time: 11:15

Type of cleaning:
X BASIC
COMPLETE
CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Re-secured rubber pad over Kevlar cable sheath with
new cable tie. Sheath was abraded through in one spot.


COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
􀂉 Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
􀂉 Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
􀂉 Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Signed: Erich Mueller
Date: 2/9/06

Sat. Transmission Antenna moved


The satalite transmission antenna was lowered aprox. 9.5 inches @ 10:40 am 8 Feb. 2006 - to improve visibility of the navigation light at nght.

Sat. bracket secured with additional hardware.

2 bands of silver reflective tape were added at 6 and 7 feet above waterline.

Eastern windbird mast secured with additional hardware.