Monday, March 06, 2006

partial full service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 3/5/06 Start time: 10:43 End time: 14:40

Type of cleaning:
X BASIC
COMPLETE
X CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Cleaned PAR sensors 3/4/06 at 14:00. All other tasks on 3/5/06.

COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
X Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: Found cable tie siezing on one shacle missing - replaced. Removed loose cable ties securing cables and added new ones. Mooring line was seen to be frayed and untwisted at base. Use with caution.

Signed: Erich Mueller
Date: 3/5/06

Thursday, February 09, 2006

basic service

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3

DATE: 2/8/06 Start time: 10:45 End time: 11:15

Type of cleaning:
X BASIC
COMPLETE
CTD Validation

BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify

Comments: Re-secured rubber pad over Kevlar cable sheath with
new cable tie. Sheath was abraded through in one spot.


COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
􀂉 Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
􀂉 Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
􀂉 Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________

Signed: Erich Mueller
Date: 2/9/06

Sat. Transmission Antenna moved


The satalite transmission antenna was lowered aprox. 9.5 inches @ 10:40 am 8 Feb. 2006 - to improve visibility of the navigation light at nght.

Sat. bracket secured with additional hardware.

2 bands of silver reflective tape were added at 6 and 7 feet above waterline.

Eastern windbird mast secured with additional hardware.

Thursday, January 26, 2006

AOML Diver Maintenance Check

CMRC/LSI Operations Monday, Jan.23, 2006

J. Craynock and H. Casanova to Georgetown, 2 red boxes, 2 gear duffels.
Bahamian Customs clearance quick, shuttle ready at airport
New CMRC boat (Parker) covered – good for transfer- E. Mueller

Tuesday, Jan. 24, 2006

Onstation at 0930. Slight current. Chop and swell present.
Tied off to mooring buoy.
Examined PAM fluorometer, took u/w pic’s prior to disassembly.
Moved boat to pylon, surfaced pressure case, detached main cable & plugged.
Coiled plugged cable to lower pylon and bundled.
Began cleaning of spectra legs and lower pylon.
Dive 1 20ft./40min. Dive 2 21ft./ 65 min.

Noticeable growth on all lashings, lashings not cleaned for last 6 (?) months
Noted chaffing points on pylon, repaired with rubber patch and tied.
Removed brackets from pylon.

Wednesday, Jan. 25, 2006

Onstation at 0915. Attached CT for groundtruthing.
Cleaned remaining legs and chains.
Installed new screens on CT, new zincs.
Dive 1 21ft./38min.

Departed station at 1130.

Returned to station at 1300.
1320 – removed CT, plugged and coiled cable.
1330 – departed station.

Returned to station at 1930, night, Brenda Gadd aboard.
Ran approaches to station to investigate light shadowing.
Definite shadow areas for light from southern approach.
Recommendations for improvement noted.

Returned to CMRC Dock 2010.

~~~~~~~~~~~
Logged by Jules Craynock

Thursday, December 29, 2005

CMRC3 CREWS Field Log

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3 (i.e. CMRC3, SRVI1)
DATE: 12/29/05 Start time: 13:45_____ End time: 14:15______
Type of cleaning: X BASIC
COMPLETE
CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains, mounting pins
X Optical sensor cleaning
X CTD screen cleaning
X Optional sensor cleaning
X PAM fluorometer monitoring heads
o SAMI pCO2 cage or inlet
o Other, please specify_________________________________

Comments: PAM acrylic lenses wiped clean – unable to remove from casing because on snorkel not SCUBA.


COMPLETE Cleaning
Finish basic cleaning plus these additional steps
􀂉 Perform CTD validation
􀂉 Clean all growth from spectra lines and chains
􀂉 Inspect shackles
􀂉 Base plate and grounding plate inspection
􀂉 Clean spectra lines at base plate
􀂉 Clean body of CTD(s) and light sensor(s)
􀂉 Clean all optional sensors
o PAM fluorometer distributor box, mounting stands, and cables
o SAMI pCO2 stainless mounting hardware and body
o Other, please specify_________________________________

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson_________________
Date: 12/29/05_____

Monday, December 19, 2005

CMRC3 CREWS Field Log

CREWS STATION CLEANING CHECKLIST

Station ID: CMRC3 (i.e. CMRC3, SRVI1)
DATE: 12/14/05 Start time: 13:30pm End time: 15:00pm

Type of cleaning: x BASIC
COMPLETE
CTD Validation

BASIC Cleaning
x Surface inspection
x Underwater inspection – station support lines, chains, mounting pins
x Optical sensor cleaning
x CTD screen cleaning
x Optional sensor cleaning
x PAM fluorometer monitoring heads
o SAMI pCO2 cage or inlet
o Other, please specify_________________________________

Comments: pCO2 cage has not been replaced yet.

COMPLETE Cleaning
Finish basic cleaning plus these additional steps
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
Clean all optional sensors
o PAM fluorometer distributor box, mounting stands, and cables
o SAMI pCO2 stainless mounting hardware and body
o Other, please specify_________________________________

Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson
Date: 12/19/05

Monday, December 12, 2005

Instruments removed February 2005

Old note here of an instrument removed FEBRURARY 2, 2005:

Biospherical Irradiometers:
BIC Model 2104R Surface Irradiometer
Serial 1020