CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3 (i.e. CMRC3, SRVI1)
DATE: 12/29/05 Start time: 13:45_____ End time: 14:15______
Type of cleaning: X BASIC
COMPLETE
CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains, mounting pins
X Optical sensor cleaning
X CTD screen cleaning
X Optional sensor cleaning
X PAM fluorometer monitoring heads
o SAMI pCO2 cage or inlet
o Other, please specify_________________________________
Comments: PAM acrylic lenses wiped clean – unable to remove from casing because on snorkel not SCUBA.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
Clean all optional sensors
o PAM fluorometer distributor box, mounting stands, and cables
o SAMI pCO2 stainless mounting hardware and body
o Other, please specify_________________________________
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson_________________
Date: 12/29/05_____
This site is for providing CMRC3 ICON/CREWS field maintenance records for NOAA/AOML/ICON data management purposes. Please update this blog whenever new operations are performed in the field, so that AOML can coordinate their efforts with the CMRC ICON/CREWS field efforts.
Thursday, December 29, 2005
Monday, December 19, 2005
CMRC3 CREWS Field Log
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3 (i.e. CMRC3, SRVI1)
DATE: 12/14/05 Start time: 13:30pm End time: 15:00pm
Station ID: CMRC3 (i.e. CMRC3, SRVI1)
DATE: 12/14/05 Start time: 13:30pm End time: 15:00pm
Type of cleaning: x BASIC
COMPLETE
CTD Validation
BASIC Cleaning
x Surface inspection
x Underwater inspection – station support lines, chains, mounting pins
x Optical sensor cleaning
x CTD screen cleaning
x Optional sensor cleaning
x PAM fluorometer monitoring heads
o SAMI pCO2 cage or inlet
o Other, please specify_________________________________
Comments: pCO2 cage has not been replaced yet.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
Clean all optional sensors
o PAM fluorometer distributor box, mounting stands, and cables
o SAMI pCO2 stainless mounting hardware and body
o Other, please specify_________________________________
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson
Date: 12/19/05
Monday, December 12, 2005
Instruments removed February 2005
Old note here of an instrument removed FEBRURARY 2, 2005:
Biospherical Irradiometers:
BIC Model 2104R Surface Irradiometer
Serial 1020
Biospherical Irradiometers:
BIC Model 2104R Surface Irradiometer
Serial 1020
CMRC3 CREWS Field Log
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3 (i.e. CMRC3, SRVI1)
DATE: 12/09/05 Start time: 08:45am End time: 09:15am
DATE: 12/09/05 Start time: 08:45am End time: 09:15am
Type of cleaning: x BASIC
COMPLETE
CTD Validation
BASIC Cleaning:
x Surface inspection
x Underwater inspection – station support lines, chains, mounting pins
x Optical sensor cleaning
x CTD screen cleaning
Optional sensor cleaning
o PAM fluorometer monitoring heads
o SAMI pCO2 cage or inlet
o Other, please specify_________________________________
Comments: Diving is still not possible and so cleaning was conducted by snorkeling. PAM heads could not be cleaned entirely, but the acrylic lenses were wiped clean in-situ. pCO2 cage has not been replaced yet.
COMPLETE Cleaning:
(Finish basic cleaning plus these additional steps )
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
Clean all optional sensors
o PAM fluorometer distributor box, mounting stands, and cables
o SAMI pCO2 stainless mounting hardware and body
o Other, please specify_________________________________
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson
Date: 12/12/05
Tuesday, December 06, 2005
CMRC3 CREWS Field Log
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3
DATE: 11/25/05 Start time: 9am End time: 10am
Type of cleaning: x BASIC
COMPLETE
CTD Validation
BASIC Cleaning
x Surface inspection
x Underwater inspection – station support lines, chains, mounting pins
x Optical sensor cleaning
x CTD screen cleaning
Optional sensor cleaning
PAM fluorometer monitoring heads
SAMI pCO2 cage or inlet
Other, please specify_________________________________
Comments: As diving is not possible at the moment, cleaning was conducted on snorkel. Because of this we were unable to clean the PAM fluorometer monitoring heads in the usual manner. Instead the acrylic lenses were wiped clean in-situ, rather than removing the entire casing. The SAMI pCO2 is yet to be replaced after removal.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
Clean all optional sensors
PAM fluorometer distributor box, mounting stands, and cables
SAMI pCO2 stainless mounting hardware and body
Other, please specify_________________________________
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson
Date: 11/25/05
Station ID: CMRC3
DATE: 11/25/05 Start time: 9am End time: 10am
Type of cleaning: x BASIC
COMPLETE
CTD Validation
BASIC Cleaning
x Surface inspection
x Underwater inspection – station support lines, chains, mounting pins
x Optical sensor cleaning
x CTD screen cleaning
Optional sensor cleaning
PAM fluorometer monitoring heads
SAMI pCO2 cage or inlet
Other, please specify_________________________________
Comments: As diving is not possible at the moment, cleaning was conducted on snorkel. Because of this we were unable to clean the PAM fluorometer monitoring heads in the usual manner. Instead the acrylic lenses were wiped clean in-situ, rather than removing the entire casing. The SAMI pCO2 is yet to be replaced after removal.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
Clean all optional sensors
PAM fluorometer distributor box, mounting stands, and cables
SAMI pCO2 stainless mounting hardware and body
Other, please specify_________________________________
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Laura Robinson
Date: 11/25/05
Subscribe to:
Posts (Atom)