Monthly cleaning was done with the ground-truthing CT and was checked for any wear and tear, which was in really good conditions. The only exception was for the surface rust on the upper links of the chain where it meets the stainless steel shackles. In all upper links of the chain, zincs were installed. As well most of all the shackles were moused with wire, which replaced the older zip ties that were in.
Besides the maintenance, the deep water CTD sensor was exchange with a "new" CTD sensor with an improved capillary tube for the pressure sensor. The replacement was done between 0830-0930. The replaced CTD sensor was brought back to the lab.
Hector Casanova
This site is for providing CMRC3 ICON/CREWS field maintenance records for NOAA/AOML/ICON data management purposes. Please update this blog whenever new operations are performed in the field, so that AOML can coordinate their efforts with the CMRC ICON/CREWS field efforts.
Wednesday, May 31, 2006
Friday, April 28, 2006
Cleaned 8 legs/chains-spectra-lashings, only soft growth found.
Station in very good condition - lack of accumulated biofouling.
Ongoing cleaning efforts working well.
Many plastic ties brittle, breaking , and need replacement.
Groundtruthing schedule:
0845.............Connected groundtruth CT
0900 - 1000...Transmitting period
1015 - 1045...Cleaned sensors
1000 - 1200...Transmitting period
1215.............Disconnect CT
1300.............Normal transmit begins
Notes:
Need some sort of zinc(?) protection for all 8 upper links of galv. chain touching SS shackles- accelerated deterioration noted.
Two temporary white warning floats attached to legs 2 & 6. Original yellow floats probably stolen. Bahamian smallboats cutting close to pylon at high speed, even when work crew present with dive flag.
J.Craynock / H. Casanova
Station in very good condition - lack of accumulated biofouling.
Ongoing cleaning efforts working well.
Many plastic ties brittle, breaking , and need replacement.
Groundtruthing schedule:
0845.............Connected groundtruth CT
0900 - 1000...Transmitting period
1015 - 1045...Cleaned sensors
1000 - 1200...Transmitting period
1215.............Disconnect CT
1300.............Normal transmit begins
Notes:
Need some sort of zinc(?) protection for all 8 upper links of galv. chain touching SS shackles- accelerated deterioration noted.
Two temporary white warning floats attached to legs 2 & 6. Original yellow floats probably stolen. Bahamian smallboats cutting close to pylon at high speed, even when work crew present with dive flag.
J.Craynock / H. Casanova
Wednesday, April 19, 2006
Basic Cleaning
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3
DATE: 04/16/06 Start time: 1530 End time: 1700
Type of cleaning:
X BASIC
COMPLETE
CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments:
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Brenda Gadd
Date: 04/19/06
Station ID: CMRC3
DATE: 04/16/06 Start time: 1530 End time: 1700
Type of cleaning:
X BASIC
COMPLETE
CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments:
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Brenda Gadd
Date: 04/19/06
Tuesday, April 04, 2006
partial full service
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3
DATE: 4/3/06 Start time: 09:50 End time: 13:40
Type of cleaning:
X BASIC
COMPLETE
X CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments: Chain marker buoys all missing. No line remnants on chains.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
Clean all growth from spectra lines and chains
X Inspect shackles
X Base plate and grounding plate inspection
Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: E. Mueller showed Brenda Gadd cleaning, CTD validation and blogging procedures.
Signed: Erich Mueller
Date: 4/3/06
Station ID: CMRC3
DATE: 4/3/06 Start time: 09:50 End time: 13:40
Type of cleaning:
X BASIC
COMPLETE
X CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments: Chain marker buoys all missing. No line remnants on chains.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
Clean all growth from spectra lines and chains
X Inspect shackles
X Base plate and grounding plate inspection
Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: E. Mueller showed Brenda Gadd cleaning, CTD validation and blogging procedures.
Signed: Erich Mueller
Date: 4/3/06
Monday, March 06, 2006
partial full service
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3
DATE: 3/5/06 Start time: 10:43 End time: 14:40
Type of cleaning:
X BASIC
COMPLETE
X CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments: Cleaned PAR sensors 3/4/06 at 14:00. All other tasks on 3/5/06.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
Clean all growth from spectra lines and chains
X Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: Found cable tie siezing on one shacle missing - replaced. Removed loose cable ties securing cables and added new ones. Mooring line was seen to be frayed and untwisted at base. Use with caution.
Signed: Erich Mueller
Date: 3/5/06
Station ID: CMRC3
DATE: 3/5/06 Start time: 10:43 End time: 14:40
Type of cleaning:
X BASIC
COMPLETE
X CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments: Cleaned PAR sensors 3/4/06 at 14:00. All other tasks on 3/5/06.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
X Perform CTD validation
Clean all growth from spectra lines and chains
X Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
X Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: Found cable tie siezing on one shacle missing - replaced. Removed loose cable ties securing cables and added new ones. Mooring line was seen to be frayed and untwisted at base. Use with caution.
Signed: Erich Mueller
Date: 3/5/06
Thursday, February 09, 2006
basic service
CREWS STATION CLEANING CHECKLIST
Station ID: CMRC3
DATE: 2/8/06 Start time: 10:45 End time: 11:15
Type of cleaning:
X BASIC
COMPLETE
CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments: Re-secured rubber pad over Kevlar cable sheath with
new cable tie. Sheath was abraded through in one spot.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Erich Mueller
Date: 2/9/06
Station ID: CMRC3
DATE: 2/8/06 Start time: 10:45 End time: 11:15
Type of cleaning:
X BASIC
COMPLETE
CTD Validation
BASIC Cleaning
X Surface inspection
X Underwater inspection – station support lines, chains,
mounting pins
X Optical sensor cleaning
X CTD screen cleaning
Optional sensor cleaning
n/a PAM fluorometer monitoring heads
n/a SAMI pCO2 cage or inlet
n/a Other, please specify
Comments: Re-secured rubber pad over Kevlar cable sheath with
new cable tie. Sheath was abraded through in one spot.
COMPLETE Cleaning
Finish basic cleaning plus these additional steps:
Perform CTD validation
Clean all growth from spectra lines and chains
Inspect shackles
Base plate and grounding plate inspection
Clean spectra lines at base plate
Clean body of CTD(s) and light sensor(s)
n/a Clean all optional sensors
n/a PAM fluorometer distributor box, mounting stands, and cables
n/a SAMI pCO2 stainless mounting hardware and body
n/a Other, please specify
Comments: __________________________________________________
__________________________________________________
__________________________________________________
__________________________________________________
Signed: Erich Mueller
Date: 2/9/06
Sat. Transmission Antenna moved

The satalite transmission antenna was lowered aprox. 9.5 inches @ 10:40 am 8 Feb. 2006 - to improve visibility of the navigation light at nght.
Sat. bracket secured with additional hardware.
2 bands of silver reflective tape were added at 6 and 7 feet above waterline.
Eastern windbird mast secured with additional hardware.